Healthcare

Scripps Memorial Cooling Tower Replacement – Value $1.13M

San Diego, CA
Building served approx. 120,000 sq ft
Modifications to the existing central plant including installation of (2) new 500 ton cooling towers, new condenser water pumps, hydronic piping, and controls.

Scripps Mercy AHU-33 Replacement – Value $300,000

San Diego, CA
Replaced an air handling unit serving the patient rooms with a new custom HuntAir air handling unit. Work was done over an occupied hospital and required a 350 ton hydraulic crane and close coordination with hospital facilities staff to schedule shutdowns.

Education/Institutional

Sunset Hills Elementary School – Value $2M

Poway, CA
80,000 sq ft
Modernization of existing elementary school and construction of 4 new classroom buildings. HVAC work consisted of new chillers, boilers, hydronic piping, and a make-up air unit for the kitchen.

Chaparral Elementary School – Value $2.4M

Poway, CA
72,000 sq ft
Modernization of school consisted of new air handling units and a new central plant with a 165 ton water cooled chiller, cooling tower, pumps, and hydronic piping.

 

Military/Government Agencies

Temecula Civic Center –  $4M

Temecula, CA
95,500 sq ft
This LEED Silver project consisted of large rooftop DX air handling units, VAV units, and DDC controls.

BCT Complex, Ft. Lewis – $8M

Tacoma, WA
226,905 sq ft
LEED Silver design-build construction of seven new three-story Bachelor’s Enlisted Quarters buildings. HVAC consisted of 2-pipe fin tube radiators, high-efficiency boilers, and an energy recovery system for the exhaust air.

Mission Critical

redIT Collocation Center – $300,000

San Diego, CA
Not available.
88,000 sq ft
New 88,000 sq ft data center expansion at redIT’s Rancho Bernardo facility. HVAC consisted of the installation of four (4) new 30 ton and two (2) new 25 ton Liebert CRAC units, refrigerant piping, condensate piping and humidifier make-up water piping.

Teradata Chiller and Piping Replacement –  $2M

San Diego, CA
450,000 sq ft
Teradata/NCR is a 450,000 square foot research and development facility. This design-build project involved the replacement of all condenser water piping throughout the complex (4 buildings) and the installation of a new 300-ton chiller plant to expand the R&D data center.  Countywide provided a design solution and finished product that alleviated the deficiencies associated with the building’s HVAC system. The new HVAC system is an energy efficient, cost effective system that provides sufficient comfort to the building occupants and minimizes maintenance work orders.