Marriott Pulse

Declan Suites, now Marriott Pulse, in downtown San Diego was renovated by Marriott, with a total of 191,658 sq ft included in the project's design-bid-build scope. The renovation was concentrated on the 264 guestrooms across 13 floors, the ground floor lobby, and 12th floor main lobby. The building was occupied during construction. Overall, the project lasted 19 months and completed in June 2017.

All equipment was owner-furnished, and included (2) AHUs, (1) Chiller, (2) Boilers, (5) 4-pipe Fan Coils, (5) Split AC units, and (33) VAVs. The central plant was completely redone. All guestroom bathrooms were re-piped and included fixture change out.


Additional Project Information:

Square Feet: 191,658
Project Location: San Diego, California
General Contractor: SMC Construction
Project Owner: Marriott Ownership Resorts Inc.